You're trying to figure out the external pressures on The AES Corporation right now, and as a seasoned analyst, I can tell you the 2025 picture is a mix of massive tailwinds from clean energy policy and real headwinds from high capital costs. We're talking about everything from the $1.90 to $2.00 expected Adjusted EPS range to the physical risks of extreme weather on their assets. This PESTLE breakdown cuts straight to the six macro forces-Political, Economic, Sociological, Technological, Legal, and Environmental-that will defintely define AES's next moves, so let's dive into the specifics you need to know before making your next call.
The AES Corporation (AES) - PESTLE Analysis: Political factors
Government policy strongly favors utility-scale clean energy projects and grid modernization.
The political environment in the US, despite recent shifts, remains fundamentally supportive of the energy transition, which is a core driver of The AES Corporation's strategy. This is not just about rhetoric; it's about concrete regulatory approvals and investment mandates. For instance, AES Indiana is making a substantial investment of over $1.2 billion in grid modernization to ensure a resilient transmission and distribution infrastructure, a move directly supported by state-level utility commissions and federal policy goals.
This favorable policy landscape is accelerating the build-out of new capacity. AES is on track to add a total of 3.2 GW of new projects to its operating portfolio by the end of 2025. This aggressive expansion is underpinned by a massive Power Purchase Agreement (PPA) backlog of approximately 12 GW, with 5.2 GW currently under construction, largely with corporate customers like hyperscalers (large data center operators). This political and regulatory push for decarbonization is the tailwind for AES's growth.
Regulatory uncertainty in Latin American markets impacts project development and repatriation of earnings.
While the US market provides a stable foundation, AES's significant footprint in Latin America introduces a layer of political and economic volatility that you must factor in. The primary risk here is not just project-specific regulation, but macro-level political instability that manifests as currency devaluation and restrictions on capital movement.
The most immediate and quantifiable impact comes from currency risk. In the 2024 Annual Report, AES reported significant unrealized foreign currency losses in Argentina of $262 million (or $0.37 per share), primarily due to the devaluation of long-term receivables denominated in Argentine pesos. This is a clear example of how political and economic policy decisions in a foreign jurisdiction directly erode US-dollar-denominated earnings.
The company's guidance for 2025 does anticipate 'normalized results in Colombia and Mexico,' which suggests that prior periods experienced abnormal volatility. Still, the risk is persistent. S&P Global assigned The AES Corporation's Argentina entity a CCC credit rating with a Stable outlook in late 2025, which is a speculative-grade rating that highlights the inherent risk of operating in that market.
Here's the quick math on the currency impact from one market:
| Market/Entity | Type of Loss (2024) | Amount of Loss | Impact on EPS |
|---|---|---|---|
| Argentina | Unrealized Foreign Currency Loss | $262 million | $0.37 per share |
| AES Andes (Chile) | Unrealized Foreign Currency Loss | $25 million | $0.03 per share |
US Inflation Reduction Act (IRA) tax credits are a major subsidy for new renewable capacity additions.
The US Inflation Reduction Act (IRA) is a game-changer, plain and simple. It provides massive, long-term subsidies-primarily through Production Tax Credits (PTC) and Investment Tax Credits (ITC)-that fundamentally change the economics of new renewable projects. The political support for these credits is the single largest financial driver for AES's US growth.
The direct financial benefit is clear in the company's guidance. AES's expectation for 2025 Adjusted EBITDA with Tax Attributes is a range of $3,950 million to $4,350 million. The 'Tax Attributes' component, which is largely driven by these IRA credits, represents the pre-tax effect of PTCs, ITCs, and accelerated depreciation allocated to tax equity investors.
However, you must be a trend-aware realist: the IRA's future is not defintely secure. A proposed bill in the Senate in mid-2025 introduced a plan to slash renewable tax credits by 60% in 2026 and eliminate them entirely by 2028. This political uncertainty creates a race against the clock.
AES's clear action to mitigate this risk is to accelerate its pipeline:
- 100% of AES's projects in development are slated to begin construction before the 2028 phaseout deadline.
- The company has already contracted essentially all major equipment and Engineering, Procurement, and Construction (EPC) for its 8.4 GW backlog of signed US projects.
- Hydropower assets, which make up about 23% of AES's renewables portfolio, have a more favorable tax credit phaseout timeline, extending until 2033.
Geopolitical tensions affect supply chains, particularly for battery storage components.
Geopolitical tensions, specifically US-China trade relations, are creating significant cost and schedule risks in the battery energy storage system (BESS) supply chain. This is a critical factor because BESS is essential for firming up intermittent solar and wind power.
The impact is already hitting AES's joint venture, Fluence. In May 2025, Fluence revised its fiscal year 2025 revenue guidance to a range of $2.6 billion to $2.8 billion (midpoint $2.7 billion), down from a prior midpoint of $3.4 billion. This $700 million reduction at the midpoint was primarily attributed to the mutual decision with customers to pause US projects due to tariff uncertainty.
The core issue is the potential for prohibitively high tariffs on BESS imports, which could reach 145% or even 245%. This political risk translates directly into project cost inflation and delays.
AES's response is a strong operational defense: the company's CEO stated that its exposure to US import tariffs is 'de minimis' through 2027 because all major equipment is either already on site or contracted for domestic production. This forward-looking procurement strategy insulates a significant portion of the current 12 GW backlog from near-term geopolitical shocks.
The AES Corporation (AES) - PESTLE Analysis: Economic factors
You're looking at how the broader economy is shaping the landscape for The AES Corporation (AES) right now, and frankly, it's a mixed bag of high financing costs offset by strong contracted revenue streams. The key takeaway for you is that while high debt levels create sensitivity to borrowing costs, AES has actively hedged its near-term interest rate exposure to protect its massive infrastructure build-out plans.
High interest rates increase the cost of capital for AES's massive infrastructure build-out
The cost of financing AES's growth is a major economic consideration, especially given the company's substantial debt load. As of mid-2025, AES's debt-to-equity ratio stood at a concerning 8.82, which is higher than nearly 99% of its peers in the Utilities - Regulated industry. This high leverage means that any sustained high interest rate environment directly pressures their bottom line, as evidenced by an interest coverage ratio of just 1.26. Still, management has been proactive; they completed all necessary financings for 2025 debt maturities and, crucially, hedged 100% of benchmark interest rate exposure for corporate financings through 2027. This hedging buys them time, but the underlying debt structure remains a risk factor if rates stay elevated past 2027. They also reduced planned renewable CapEx by $1.3 billion through 2027 to lessen capital intensity.
Strong US dollar creates currency translation risk for earnings from international operations
Since AES operates globally, the strength of the US dollar (USD) directly impacts how much their foreign earnings are worth when translated back to dollars. The company's 2025 guidance was set based on currency forward curves as of March 31, 2025. To give you a concrete idea of the sensitivity, a hypothetical 10% appreciation of the USD relative to the December 31, 2024, forward curves was estimated to cause an annualized impact of ($20) Million on Adjusted PTC (Post-Tax Contributions). We've seen this pain before; in 2024, unrealized foreign currency losses, mainly from the Argentine Peso devaluation, hit $262 million, or about $0.37 per share. The strategy to mitigate this has been portfolio simplification, including the sale of AES Brasil, which held assets contracted in Brazilian reals. That's smart risk management, but currency fluctuations will always be a factor in their international segments.
AES expects 2025 Adjusted EPS to be in the range of $1.90 to $2.00 per share
You asked about the $1.90 to $2.00 range, but based on their reaffirmed guidance as of mid-2025, The AES Corporation is actually targeting a slightly better outcome. Management has maintained its full-year 2025 guidance for Adjusted Earnings Per Share (Adjusted EPS) in the range of $2.10 to $2.26 per share. This is what they expect to earn after adjusting for one-time items. To be fair, the consensus among analysts tracking the stock is a bit lower, averaging about $1.93 per share for the fiscal year. The company's growth drivers for this forecast include new renewables projects and rate base growth at their US utilities, partially offset by the absence of a one-time PPA monetization benefit from 2024.
Commodity price volatility, especially for natural gas, affects legacy power generation profits
While AES is aggressively shifting to renewables, its legacy power generation, which still uses natural gas, remains exposed to commodity price swings. Natural gas volatility has actually moderated somewhat in the first half of 2025, with quarterly volatility falling from 81% in Q4 2024 to 69% by mid-2025, suggesting a return to more typical market patterns. However, the market is still jumpy; in August 2025, Henry Hub prices swung sharply, peaking at $3.05/MMBtu before dropping to $2.78/MMBtu in a single month, driven by geopolitical jitters and speculative trading. AES's 2025 outlook is based on commodity forward curves from March 31, 2025, which priced the expected annual average Henry Hub price around $3.80/MMBTU. Any sustained deviation from that assumption will definitely impact the profitability of their non-contracted or shorter-term gas assets.
Here's a quick look at the key economic metrics influencing AES's 2025 outlook:
| Metric | Value / Range (2025 Fiscal Year Data) | Source Context |
| Reaffirmed Adjusted EPS Guidance | $2.10 to $2.26 per share | Official Company Guidance |
| Analyst Consensus EPS Estimate | $1.93 per share | Average Analyst Expectation |
| Debt-to-Equity Ratio | 8.82 | Indicates high leverage |
| Interest Rate Hedging Coverage | 100% of benchmark exposure through 2027 | Mitigation strategy for capital costs |
| Estimated 10% USD Appreciation Impact (Annualized) | ($20) Million on Adjusted PTC | Currency Translation Sensitivity |
| Natural Gas Quarterly Volatility (Mid-2025) | 69% (down from 81% in Q4 2024) | Trend in benchmark price stability |
Finance: draft 13-week cash view by Friday
The AES Corporation (AES) - PESTLE Analysis: Social factors
You're looking at how public sentiment and workforce dynamics are shaping the playing field for The AES Corporation right now, in late 2025. It's not just about the tech or the money; it's about people and what they expect from their power providers.
Growing public demand for decarbonization drives utility-scale renewable project acceptance
The public push for cleaner power is definitely helping projects like the ones The AES Corporation is building. People want to see the transition happen, and they are increasingly supportive of large-scale solar and wind farms, provided they are built reliably. The AES Corporation has made a very public commitment to this, aiming to have zero coal in its portfolio by the end of 2025, accelerating an earlier target. This aligns perfectly with the social desire to see major utilities move away from thermal generation. To be fair, this acceptance is also tied to their ability to maintain reliability, which is why their 12 GW backlog of signed long-term Power Purchase Agreements (PPAs) is so important-it shows customers are signing up for the new energy mix.
Labor shortages for skilled technicians slow down the construction and maintenance of new grids
Here's where things get tricky on the ground. While the demand for green projects is high, the people needed to build and maintain the new infrastructure are scarce. Honestly, the construction sector is facing a major crunch. Industry models estimate that around 439,000 additional workers will be needed in 2025 alone just to meet overall demand. For The AES Corporation, this translates to potential delays and higher costs for their massive renewable buildout. Furthermore, the LinkedIn 2025 Green Skills Report noted that the rate of hiring for green roles is expanding almost twice as fast as the development of those skills, creating a significant skills gap for specialized technicians needed for solar, wind, and battery storage projects. If onboarding takes 14+ days longer than planned due to staffing, project timelines get pushed.
Increased focus on energy equity and access in developing markets where AES operates
In the developing markets where The AES Corporation operates, there is a sharp social focus on ensuring the energy transition is also a just transition. It's not enough to just build renewables; the power must be reliable and affordable for everyone. For example, The AES Corporation has been working with governments in places like the Dominican Republic and Panama to develop solutions that provide reliable capacity while actively reducing reliance on dirtier, often more expensive, fuel oil and diesel. This focus on energy access and mitigating the impact of weather events on service delivery is a key social license to operate in these regions.
Shifting consumer behavior toward electric vehicles (EVs) boosts demand for grid capacity
You can see the change happening on the roads; more people are buying electric vehicles (EVs), and this directly stresses the grid. This shift means The AES Corporation and its utility subsidiaries must invest heavily in modernization to avoid blackouts during peak charging times. While the full impact is projected toward 2030, the trend is clear now. Estimates suggest that EV adoption alone could add between 100 TWh and 185 TWh to national electricity demand by 2030, which is about 2.5% to 4.6% of anticipated total consumption. This forces The AES Corporation to plan for bidirectional power flow and smart charging solutions, like vehicle-to-grid (V2G) integration, to manage the variability. It's a massive, tangible demand signal.
Here's a quick view of the key social metrics impacting The AES Corporation as of 2025:
| Social Factor Metric | Value/Data Point (2025 Context) | Source Relevance | |
| Coal Exit Target (Majority) | By End of 2025 | Decarbonization Goal | |
| Construction Labor Shortage (US Estimate) | Need for 439,000 additional workers in 2025 | Skilled Technician Shortage | |
| Renewable PPA Backlog (Total) | 12 GW signed | Project Acceptance/Demand | |
| Projected EV Load Increase (by 2030) | 100 TWh to 185 TWh annually | EV Demand on Grid | |
| Renewables SBU Adjusted EBITDA Growth (YoY Q2 2025) | 56% | Public Demand/Investment Alignment |
Finance: draft 13-week cash view by Friday
The AES Corporation (AES) - PESTLE Analysis: Technological factors
You're looking at how technology is reshaping the playing field for The AES Corporation right now, in late 2025. Honestly, the pace of change is the biggest factor here; it's not just about building power plants anymore, it's about building smart, flexible, and secure energy systems. The core of this is the relentless march of renewable technology, which is making legacy assets look expensive by comparison.
Rapid cost decline and efficiency gains in solar photovoltaic (PV) and wind power
The cost-competitiveness of solar PV and wind power continues to be a massive tailwind for The AES Corporation's growth strategy. Wood Mackenzie data from late 2025 shows utility-scale solar PV delivering generation costs as low as $27/MWh in China, with onshore wind in some APAC markets hitting $25/MWh. BloombergNEF projected that global benchmarks for wind and solar generation would decline by another 4% and 2%, respectively, in 2025. This ongoing efficiency gain directly supports The AES Corporation's focus on securing long-term Power Purchase Agreements (PPAs), especially with data center clients who are highly sensitive to the Levelized Cost of Electricity (LCOE).
Battery Energy Storage Systems (BESS) technology is critical for grid flexibility and firming power
Battery Energy Storage Systems (BESS) are no longer optional; they are the essential partner to variable renewables, firming up power delivery. Globally, grid-connected BESS installations hit 156 GWh through October 2025, marking a 38% year-on-year increase. The AES Corporation is clearly in this race, having completed its 200 MW Pike County energy storage project, which is the largest operational battery storage project in MISO. The economics are improving too; the global benchmark cost for battery storage projects fell to $104/MWh in 2024 and was expected to dip below $100/MWh in 2025. This makes integrating large-scale solar and wind projects, like the 170 MW Crossvine solar-plus-storage project The AES Corporation is developing, much more viable.
Here's a quick look at how the storage market is scaling up:
| Metric | Value (as of Oct 2025) | Context |
| Global Grid-Scale BESS Capacity | 156 GWh | Year-to-date operational capacity |
| Year-on-Year Growth (Global) | 38% | Through October 2025 vs. 2024 |
| US New Capacity (October 2025) | 2.3 GWh | Monthly addition, up 13% year-on-year |
| Projected Battery LCOE (2025) | < $100/MWh | Global benchmark expectation |
Digitalization of the grid (smart grids) improves operational efficiency and reduces outage times
The grid itself is becoming a software problem, not just a hardware one. Digitalization, using things like Artificial Intelligence (AI) and the Internet of Things (IoT), is key to managing the complexity of distributed energy resources. Digital solutions can slash operational costs in power generation by up to 20%. For The AES Corporation's US utilities, AES Indiana and AES Ohio, modernization is a priority; they invested over $1.6 billion in 2024 to improve reliability. AI-driven forecasting is showing real results, with some estimates suggesting it can improve grid stability by up to 20%. Also, the sheer volume of connected devices is massive; over 1.2 billion IoT devices are expected in the global energy sector by 2025.
The benefits are clear:
- Reduce operational costs in generation by up to 20%.
- Improve predictive maintenance accuracy in wind farms by 25%.
- Increase visibility into energy flows for better planning.
- Enhance grid stability with AI-based forecasting.
Need to invest defintely in cybersecurity to protect distributed energy assets from attacks
With all this digitalization, you've got a much wider attack surface. The proliferation of IoT devices and the integration of AI mean that protecting operational technology (OT) systems is now a top-tier risk. The AES Corporation's strategy of securing long-term, dollar-denominated PPAs is great for revenue quality, but every new solar farm, battery site, and smart meter is a potential entry point for a cyber threat. The industry recognizes this; cybersecurity is now seen as an essential enabler for resilience in the face of a rapidly expanding smart grid market. If onboarding takes 14+ days, churn risk rises, and a major cyber event could halt that progress entirely. You have to assume that the threat actors are targeting these distributed assets specifically.
Finance: draft 13-week cash view by Friday.
The AES Corporation (AES) - PESTLE Analysis: Legal factors
You're looking at the fine print, the rules of the road that can either smooth your path or throw up massive roadblocks for The AES Corporation. Honestly, the legal landscape for a global energy player like AES is a minefield of regulatory compliance and jurisdictional risk. We need to map out where the legal friction points are right now, in late 2025, so we can plan our next moves.
Complex permitting processes for new transmission lines and renewable projects delay deployment
Permitting remains a major headache, especially for the 11.9 GW backlog of signed renewable contracts AES needs to bring online through 2027. The U.S. system, underpinned by statutes that haven't kept pace, fuels subjective reviews and litigation. For energy projects facing legal challenges, the median time spent between agency approval and a final court decision is a staggering 3 years. This delay directly strains grid reliability; the U.S. Department of Energy warned in its July 2025 report that infrastructure delays increase the risk of power outages by 100 times by 2030 under certain load growth scenarios. Furthermore, political shifts can cause sudden stops, like the January 20, 2025 executive order that paused federal permitting for offshore wind projects while the Interior Department reviewed applications. If onboarding a new project takes that long, our internal timelines definitely suffer.
Strict anti-trust scrutiny on mergers and acquisitions in the consolidated utility sector
The utility sector is consolidating, with total deal value hitting approximately $77.7 billion between May 2024 and May 2025. This environment means any M&A activity AES considers will face intense scrutiny from the FTC and DOJ. While staff cuts at antitrust agencies could speed up reviews for some deals, resource constraints might slow down investigations that warrant a Second Request. The sector saw a massive $26+ billion deal in January 2025, showing the appetite for scale, but AES must navigate this regulatory minefield carefully. To be fair, AES has historically used alternative capital structures, like the 30% minority interest sale in its Indiana utility subsidiary back in 2014, to raise equity without a full-blown merger.
International contract law and arbitration are key to protecting assets in emerging markets
Operating globally means your contracts are your primary defense, especially where geopolitical turbulence is high. In places like Argentina, new laws enacted in July 2024 explicitly provide for arbitration as a dispute resolution method for qualifying large foreign investments, offering stability against expropriation and currency exchange restrictions. This is crucial because resource nationalism remains a risk in certain regions. To manage these cross-border disputes efficiently, institutions are updating their frameworks; for instance, the Singapore International Arbitration Centre (SIAC) introduced its 2025 Rules on January 1, 2025, which include a streamlined procedure for disputes valued at 1 million Singapore dollars or less. Here's the quick math: for AES's international portfolio, having clear, modern arbitration clauses is non-negotiable.
New SEC climate disclosure rules increase reporting burden and litigation risk
The regulatory landscape for climate reporting is fractured as of late 2025. The SEC voted on March 27, 2025, to cease its defense of the climate disclosure rules finalized in 2024, meaning they have not gone into effect for the 2025 fiscal year filings. However, this doesn't eliminate the risk; companies still face mandatory reporting under state laws, like California's, and international mandates like the EU's Corporate Sustainability Reporting Directive (CSRD), which is fully enforced starting in 2025. Inaccurate or omitted climate information, even under these non-SEC regimes, still opens the door to greenwashing lawsuits from shareholders and NGOs. What this estimate hides is the internal cost of building the systems to track Scope 1 and 2 emissions, which is now required by other global standards like IFRS S2.
We need a clear view of the legal exposure across these areas. Finance: draft 13-week cash view by Friday.
Here is a snapshot of the key legal factors impacting AES:
| Legal Factor | Key Metric/Data Point (2025 Context) | Primary Impact on AES |
|---|---|---|
| Permitting Delays | Median 3 years for project litigation resolution. | Slows deployment of 11.9 GW renewable backlog. |
| M&A Scrutiny | Sector deal value reached $77.7 billion (May 2024-May 2025). | Increased regulatory hurdle for strategic consolidation or divestitures. |
| International Contracts | Argentina law explicitly provides for arbitration for new foreign investments. | Requires robust international contract law expertise to protect overseas assets. |
| Climate Disclosure | SEC defense withdrawn March 2025; rules never effective for FY2025. | Compliance burden shifts to state/international rules (e.g., EU CSRD), maintaining litigation risk. |
The AES Corporation (AES) - PESTLE Analysis: Environmental factors
You're looking at how the planet's changing conditions are hitting the bottom line at AES, and honestly, the pressure is only going up. The company has set a firm target to slash its carbon intensity by 70% by 2030, using 2016 as the baseline year. This is a big jump from their earlier 50% goal, showing they are serious about the transition. To help hit that, AES is pushing hard to exit coal generation, aiming to have less than 10% of its portfolio running on coal by the end of fiscal year 2025. That's a major operational shift. It's not just about emissions, though; it's about physical assets, too.
Extreme weather events increase physical risk to transmission and distribution assets
The reality is that hurricanes, intense heatwaves, and flooding are becoming more frequent, and they directly threaten the wires and substations you rely on. When transmission lines heat up too much, their safe carrying capacity drops, which is a real problem when demand spikes from air conditioning on those same hot days. Storms and heavy rain can cause physical damage, leading to outages that take time to fix. For instance, recent events have shown that while distribution networks have localized issues, transmission failures can have a much wider, more impactful reach across the grid. You defintely need to factor in higher capital expenditure for hardening these assets.
Water scarcity in some operating regions pressures thermal power plant operations
Thermal power plants, even those running on cleaner natural gas (LNG), still need water for cooling, and scarcity is a growing concern in places where AES operates. We've seen issues pop up before, like in Indiana where a coal plant faced violations related to water permits. While AES is actively substituting higher-emission fuels like fuel oil with LNG-which has helped avoid an estimated 19.8 million tons of CO2 in places like the Dominican Republic and Panama over 26 years-the long-term water footprint of any thermal generation remains a point of operational risk. It's a balancing act between reliability and resource use.
Increased scrutiny on the disposal and recycling of large-scale lithium-ion batteries
As AES rapidly deploys battery energy storage-they had 16.2 GW of operating renewables as of the end of 2024, with storage being a key component-the end-of-life management for those massive lithium-ion batteries is under the microscope. Regulators, like the U.S. Environmental Protection Agency (EPA), are paying closer attention to recycling requirements under the Resource Conservation and Recovery Act (RCRA) due to fire risks and the need for a circular economy. The EPA signaled it expects to propose new rules in February 2026, which means the compliance and logistics costs for battery disposal will certainly rise in the near term. This scrutiny is a direct consequence of the massive build-out you are seeing now.
Here's a quick look at some key environmental performance indicators and risks as we stand in 2025:
| Environmental Metric/Risk | Value/Target (as of 2025) | Source/Context |
| Carbon Intensity Reduction Target | 70% by 2030 (from 2016 baseline) | Core Decarbonization Goal |
| Coal Generation Portfolio Share | Targeting < 10% by end of 2025 | Accelerated internal retirement schedule |
| Operating Renewable Assets (as of YE 2024) | 16.2 GW | Platform for future growth |
| New Growth Project Investment (2025 Est.) | Approx. $1.8 billion | Focus heavily weighted to the U.S. |
| Battery Recycling Rulemaking Timeline | EPA Proposed Rule expected February 2026 | Increased regulatory compliance risk |
Finance: draft 13-week cash view by Friday.
Disclaimer
All information, articles, and product details provided on this website are for general informational and educational purposes only. We do not claim any ownership over, nor do we intend to infringe upon, any trademarks, copyrights, logos, brand names, or other intellectual property mentioned or depicted on this site. Such intellectual property remains the property of its respective owners, and any references here are made solely for identification or informational purposes, without implying any affiliation, endorsement, or partnership.
We make no representations or warranties, express or implied, regarding the accuracy, completeness, or suitability of any content or products presented. Nothing on this website should be construed as legal, tax, investment, financial, medical, or other professional advice. In addition, no part of this site—including articles or product references—constitutes a solicitation, recommendation, endorsement, advertisement, or offer to buy or sell any securities, franchises, or other financial instruments, particularly in jurisdictions where such activity would be unlawful.
All content is of a general nature and may not address the specific circumstances of any individual or entity. It is not a substitute for professional advice or services. Any actions you take based on the information provided here are strictly at your own risk. You accept full responsibility for any decisions or outcomes arising from your use of this website and agree to release us from any liability in connection with your use of, or reliance upon, the content or products found herein.