Barrick Gold Corporation (GOLD) in 2025 operates a tight wire act: geopolitical stability is their biggest revenue risk, but operational efficiency is their immediate cost lever. We see All-in Sustaining Costs (AISC) pushing toward an estimated $1,250/oz, so every political negotiation in places like Tanzania or the Dominican Republic directly impacts your investment thesis. The real story isn't just the gold price; it's how they manage over $1.8 billion in 2025 capital expenditure while navigating complex legal hurdles and deploying autonomous tech. Let's map out the six critical macro-factors defining Barrick's next move.
Barrick Gold Corporation (GOLD) - PESTLE Analysis: Political factors
Resource nationalism remains a key risk, particularly in Tanzania and Papua New Guinea, impacting license security.
You need to understand that political risk isn't just about coups; it's about a host country's government moving the goalposts on ownership and revenue sharing-what we call resource nationalism. Barrick Gold is defintely exposed here, particularly in Africa and Oceania, and the costs are measurable.
The most recent, concrete example is the resolution of the two-year dispute with the Malian government over the Loulo-Gounkoto complex. This conflict, centered on a revised mining code, resulted in Barrick recording a $1 billion revenue write-off over the dispute period, which is a massive figure-it exceeded the complex's $900 million revenue generation for 2024 by approximately 11%. Furthermore, the government seized 3 metric tons of gold in 2025 as an enforcement mechanism. The resolution in November 2025 restored operational stability, but the financial impact is a clear cost of doing business in politically fragile regions.
In Tanzania, the political framework is more stable now through the Twiga Joint Venture (JV), established after the 2017 tax dispute. The government holds a 16% stake in the North Mara and Bulyanhulu mines. Barrick has injected over $4.24 billion into the Tanzanian economy since 2019, including a $888 million contribution in 2024 alone. This partnership model is key to maintaining the Tier 1 status of these assets, which produced over 500,000 ounces of gold in 2024.
The political risk in Papua New Guinea (PNG) has also materialized into a new ownership structure for the Porgera mine. After a four-year closure, the mine restarted in late 2023 under a new framework where PNG stakeholders-including the government and local landowners-hold a 51% majority stake, with Barrick Niugini Limited (BNL) holding 49%. The economic benefits are now shared on a 53%/47% basis in favor of PNG stakeholders over the life of the mine, which is projected to generate more than $7 billion in economic benefits over 20 years. This shift is a direct result of the government's 'take back PNG' campaign.
| Jurisdiction | Political/License Status (2025) | Quantifiable Impact/Stake |
|---|---|---|
| Mali (Loulo-Gounkoto) | Resolution reached in Nov 2025 after a two-year dispute over a new mining code. | $1 billion revenue write-off; government seized 3 metric tons of gold in 2025. |
| Tanzania (North Mara, Bulyanhulu) | Stable under the Twiga Joint Venture (since 2019). | Government holds a 16% stake; Barrick contributed $888 million to the economy in 2024. |
| Papua New Guinea (Porgera) | Restarted operations (late 2023) under a new partnership agreement. | PNG stakeholders hold a 51% equity stake; economic benefits are split 53%/47% (PNG/BNL). |
The Reko Diq copper-gold project in Pakistan requires stable government support to meet its 2028 production timeline.
The Reko Diq project is a massive, multi-generational investment in a region that carries significant geopolitical risk, located near the borders of Afghanistan and Iran. Barrick's ability to hit the target of first production by 2028 is entirely dependent on sustained political stability and government cooperation in Pakistan.
The project is currently on track, thanks to a stable fiscal and governance framework approved by the Supreme Court in 2022. Barrick is the operator and holds a 50% indirect stake. The remaining 50% is held by Pakistani stakeholders, including a 10% free-carried interest for the Government of Balochistan. The total estimated investment is $10 billion, with the first phase alone costing an estimated $5.5 billion. The long-term upside is huge: the project is expected to generate approximately $74 billion in free cash flow over its projected 37-year life. Any political upheaval or a return to the previous dispute, which resulted in a potential $11 billion penalty against Pakistan, would immediately jeopardize this value.
Ongoing negotiations with the Dominican Republic over tax and royalty frameworks for the Pueblo Viejo expansion.
The political risk at the major Pueblo Viejo mine in the Dominican Republic has shifted from tax negotiations to regulatory and legal challenges. The expansion, which aims to extend the mine life beyond 2040, has an estimated capital cost of around $2.6 billion.
The immediate political hurdle is the legal system. In May 2025, two constitutional 'amparo' actions (injunctions) were filed in an administrative court by local groups and environmental organizations to halt the construction of the new Naranjo tailings storage facility (TSF) and revoke its environmental license. As of September 30, 2025, Barrick had spent $1.19 billion on the project, so the legal challenge directly threatens the return on this substantial investment. Barrick maintains that the claims have no merit, but the ongoing legal process is a clear regulatory risk that could delay the project and increase capital expenditure.
Geopolitical tensions globally directly increase gold's safe-haven appeal, boosting Barrick's revenue outlook.
Here's the quick math: when global political uncertainty rises, so does the price of gold, and that directly boosts Barrick's revenue and net income. Geopolitical tensions, coupled with structural factors like central bank buying, drove gold prices above $4,000 per ounce in 2025, hitting a record high before a Q4 pullback.
Central banks have been net buyers, adding over 1,000 metric tons annually since 2022, a clear vote of no-confidence in traditional reserve currencies amid global policy uncertainties. This 'fear trade' has paid off for Barrick, whose net income surged by 100% in the third quarter of 2025. Some analysts are now projecting gold could reach $5,000 per ounce next year if political risks continue to escalate. This is a powerful, countervailing political opportunity that offsets the operational risks in specific jurisdictions.
- Gold prices surged above $4,000 per ounce in 2025.
- Barrick's net income increased by 100% in Q3 2025.
- Central banks purchased over 1,000 metric tons of gold annually since 2022.
Barrick Gold Corporation (GOLD) - PESTLE Analysis: Economic factors
Inflationary pressure is pushing Barrick's All-in Sustaining Costs (AISC) towards an estimated $1,250/oz for the 2025 fiscal year.
You need to look past the old cost estimates; global inflation is hitting the mining sector hard, and Barrick Gold Corporation is defintely not immune. The inflationary pressure on consumables like fuel, energy, and labor has pushed the All-in Sustaining Costs (AISC) guidance for 2025 well above earlier projections. The latest full-year 2025 guidance, adjusted for current gold prices and royalty impacts, places the AISC in the range of $1,510-$1,610 per ounce. That's a significant increase from the initial forecasts and a critical metric for margin compression. Even with targeted efficiency gains, the reality of global supply chain costs is clear.
For context, the All-in Sustaining Cost (AISC) is the true measure of a miner's cost base, including capital sustaining expenditures, corporate overhead, and exploration. The third quarter of 2025 already saw Barrick Gold Corporation's AISC at $1,538 per ounce. This figure is what you must track, not a lower, outdated estimate.
Global interest rate policy shifts influence the US Dollar, which inversely affects gold demand and pricing.
The Federal Reserve and other central banks' interest rate policies are a major lever on the US Dollar (USD) strength, and that directly impacts gold's appeal. When global trade tensions intensify, like those driven by aggressive new import tariffs, it heightens investor anxiety, pushing capital toward safe-haven assets like gold. This dynamic has been a primary driver behind the yellow metal's performance in 2025.
The result is a gold market that has seen prices rocket roughly 55% this year, with gold currently hovering above the $4,000 per ounce level as of November 2025. Central banks worldwide are also accumulating gold reserves, further supporting the price floor. Simply put, a strong USD can make gold more expensive for international buyers, but the current geopolitical risk and central bank buying are overriding that headwind, keeping gold prices high.
Capital expenditure for major growth projects is budgeted for over $1.8 billion in 2025, demanding significant cash flow.
Barrick Gold Corporation is prioritizing high-return expansion, which requires massive capital outlay. The total capital budget for major growth projects is substantial, demanding close scrutiny of cash flow generation. The Lumwana Super Pit expansion in Zambia, for example, is a major copper project with an estimated total project capital cost of $2 billion, with construction commencing in 2025. This is a multi-year investment that will materially grow the company's copper production.
Other key growth projects demanding capital in 2025 include the Pueblo Viejo plant expansion in the Dominican Republic and the advancement of the Fourmile project in Nevada. The company's overall capital budget allocates 40% to high-return expansion projects.
- Lumwana Super Pit: $2 billion total project cost.
- Pueblo Viejo Expansion: Critical to unlocking full value.
- Fourmile Project: Advancing to prefeasibility.
A $100/oz change in the gold price impacts Barrick's annual operating cash flow by approximately $170 million.
The leverage Barrick Gold Corporation has to the gold price is far more significant than that $170 million estimate. Based on the company's Investor Day presentation, a US$100/oz change in the gold price will increase Barrick's annual operating cash flow by more than US$1.5 billion. That's the real scale of the exposure you need to consider. This massive sensitivity is due to the company's large production base, which is guided for 4.6-4.9 million ounces of gold in 2025. Every dollar of price change is multiplied across millions of ounces.
This sensitivity is why the surge in gold prices to over $4,000 per ounce has driven record cash flow. Barrick Gold Corporation generated a record quarterly operating cash flow of $2.4 billion in the third quarter of 2025, an 82% jump over the previous quarter. This is the cash engine funding the major capital projects and shareholder returns.
| 2025 Fiscal Year Key Economic Metrics | Guidance/Actual Data | Source/Context |
|---|---|---|
| Gold AISC (All-in Sustaining Costs) | $1,510-$1,610 per ounce | Adjusted full-year guidance (as of Nov 2025). |
| Q3 2025 Operating Cash Flow | $2.4 billion | Record quarterly result; 82% increase over Q2 2025. |
| Q3 2025 Free Cash Flow | $1.5 billion | Record quarterly result; surged 274% year-over-year. |
| Gold Price Sensitivity ($100/oz change) | More than US$1.5 billion impact on annual operating cash flow | Based on Investor Day presentation. |
| Lumwana Project Capital Cost (Total) | $2 billion | Major copper growth project commencing construction in 2025. |
Barrick Gold Corporation (GOLD) - PESTLE Analysis: Social factors
Maintaining a social license to operate (SLO) is crucial for securing permits for mine life extensions
The core of Barrick Gold's long-term viability, especially at its Tier One assets, rests on maintaining its Social License to Operate (SLO). This isn't just a feel-good phrase; it's a hard business requirement that directly influences permitting for mine life extensions and new projects. Honestly, if the local community and government don't trust you, you don't get to dig.
A clear example of this risk materializing was the dispute with the Malian government over the Loulo-Gounkoto complex in 2025. The conflict, partly driven by resource nationalism and new mining code implementation, led to a 10-month operational suspension and provisional state administration of the asset from January to October 2025, before a resolution was reached in November 2025. That's a massive, tangible hit to production and reputation.
Conversely, success in SLO is seen at the Pueblo Viejo mine in the Dominican Republic, where the expansion is designed to extend the mine life beyond 2040. The project requires significant social investment, including the ongoing construction of new homes for resettlement and community facilities in 2025, demonstrating that a mine life extension is contingent on meeting these social commitments.
Community development spending is a major commitment, often exceeding $50 million annually across global operations
Barrick Gold's financial commitment to community development is substantial and strategic, moving beyond simple charity to a model of shared value. This spending is essential for mitigating social risks and securing the SLO.
In the 2024 fiscal year, the company invested over $48 million in community-led projects globally, a figure that is defintely on track to be met or exceeded in 2025. These funds are deployed through Community Development Committees (CDCs) at all operational sites, ensuring local leaders, women, and youth representatives select the projects, which makes the investment more impactful.
The cumulative impact is significant: since the 2019 merger, Barrick Gold's CDCs have invested more than $200 million in community-led projects like schools, clinics, and water infrastructure. Here's the quick math on recent social investment:
| Metric | Value (2024 Fiscal Year) | Source/Context |
|---|---|---|
| Global Community Investment | Over $48 million | Invested in community-led projects globally. |
| Nevada Gold Mines Social Investment | $14.9 million | Specific social investments in Nevada, USA. |
| Total Local Procurement Spend | Over $7.1 billion | Spent on goods and services from host country businesses. |
| Local Community Procurement Spend | $2.35 billion | Spent specifically with suppliers closest to mine operations. |
Securing and retaining skilled local labor is a persistent challenge, especially in remote African and South American sites
While Barrick Gold prioritizes local hiring, the reality of operating in remote, often developing, jurisdictions creates a persistent challenge in securing and retaining the highly specialized technical and managerial talent needed for a modern mining operation. It's tough to find a world-class millwright who wants to live in a remote part of Mali or Zambia long-term.
The 2025 operational suspension in Mali highlighted this risk: extended shutdowns create a severe challenge for maintaining skilled workforce capabilities, as specialized technical personnel may seek employment elsewhere, leading to knowledge gaps that are costly and time-consuming to address upon restart. This is a direct threat to operational efficiency.
To mitigate this, the company focuses on local capacity building, which is a long game. The goal is to provide a stable, motivated, and talented workforce by developing it directly from the host nation population.
Focus on local content policies to ensure employment and procurement benefits stay within host nations
Local content-the policy of maximizing the use of local labor, goods, and services-is a non-negotiable social and political requirement in nearly all of Barrick Gold's host nations. It's a key mechanism for ensuring that a significant portion of the economic value generated by the mine remains in the country.
Barrick Gold has demonstrably made this a core part of its operations, which is a significant competitive advantage in politically sensitive regions. The numbers speak for themselves on their success in localization:
- 97% of Barrick Gold's total workforce are host country nationals.
- 76% of the company's senior site management positions are held by host country nationals.
- Procurement spending on local and in-country suppliers reached over $7.1 billion in 2024.
This focus isn't just a choice; it's increasingly mandated. The 2025 Mali dispute resolution, for instance, involved strengthened local content obligations, including mandatory local labor employment and domestic supplier utilization. This trend of increasing local content requirements is a clear near-term risk and opportunity map: meet the mandate, or face operational disruption. Finance: draft 13-week cash view by Friday to model the impact of a 30-day operational pause in a key African jurisdiction.
Barrick Gold Corporation (GOLD) - PESTLE Analysis: Technological factors
Deployment of autonomous haulage systems is accelerating at Nevada Gold Mines to improve operational efficiency.
You're seeing Barrick Gold Corporation make a major move to automate its core operations, and it's a defintely a game-changer for efficiency and safety. The joint venture, Nevada Gold Mines (NGM), is partnering with Komatsu to deploy the FrontRunner Autonomous Haulage System (AHS) across its surface operations in the U.S.. This is not a small pilot; it involves automating their fleet of heavy-duty 300-tonne and 230-tonne haul trucks. This initiative, which had a live demonstration at the Cortez operations in July 2025, is the first U.S. implementation of Komatsu's AHS for both companies.
The immediate payoff is in worker safety, as it minimizes human exposure to high-risk environments. But for the financials, the key is the enhanced operational predictability, better fuel consumption, and continuous operations that come from a machine-driven fleet. To support this, a customized 5G communications infrastructure is being deployed by Sedna and Nokia, providing the high-speed, low-latency connectivity essential for real-time data exchange and seamless system performance.
- Automating 300-tonne and 230-tonne haul trucks.
- First U.S. deployment of Komatsu's AHS for Barrick.
- Network foundation is a customized 5G communications infrastructure.
Digital twin technology is being used for real-time optimization of processing plants like Loulo-Gounkoto in Mali.
Digital twin technology-a virtual replica of a physical asset or process-is central to Barrick's push for better resource recovery. Barrick utilizes these virtual models to manage and optimize ore processing facilities across its portfolio. This allows engineers to simulate process parameters and test different strategies in a virtual environment before making changes in the real world, leading to improved performance and cost savings.
While the Loulo-Gounkoto mine in Mali faced a temporary operations suspension and was excluded from the company's 2025 guidance, the underlying strategy remains to use this technology for real-time optimization at its processing plants. The industry expectation for this technology is significant: digital twins are projected to boost mining productivity by up to 20% and reduce equipment maintenance costs by up to 15%. That's a huge potential lever for margin expansion in a high-volume business.
Advanced data analytics help predict equipment failure, aiming to reduce unplanned downtime by up to 15%.
Unplanned downtime is a killer for mining margins; it can cost millions per day in lost production. Barrick is tackling this head-on with advanced data analytics and predictive maintenance. The company has integrated asset condition monitoring systems, like Petasense, with process data systems, such as the OSIsoft PI system, at sites like the Cortez plant in Nevada.
This integration gives reliability engineers a single interface to view process parameters alongside vibration data, allowing them to spot potential equipment issues days or weeks before they escalate into a failure. Earlier predictive maintenance efforts at Cortez demonstrated real savings, avoiding major equipment failures and reducing total failures from engine, brake, or suspension issues by 30%, saving approximately $500,000 from a single early fault detection. The broader industry goal, driven by AI-powered analytics, is to reduce mining equipment downtime by up to 30% by 2025.
Here's the quick math on the value of proactive maintenance:
| Metric | Industry Potential (2025) | Barrick's Past Results (Cortez) |
|---|---|---|
| Reduction in Unplanned Downtime | Up to 30% | Avoided multiple major failures. |
| Reduction in Equipment Failures | N/A | Reduced engine/brake/suspension failures by 30%. |
| Cost Avoidance Example | N/A | Saved approximately $500,000 from one early fault detection. |
Investing in renewable energy integration to power mines and reduce reliance on costly fossil fuels.
The push for decarbonization is a technological challenge that directly impacts the bottom line by reducing fuel costs and mitigating regulatory risk. Barrick has a firm commitment to cut its greenhouse gas (GHG) emissions by 30% by 2025. A core strategy to hit this target is the integrated adoption of renewable energy sources, like solar and wind power, particularly at remote sites where diesel is expensive and logistically complex.
Major solar and hydro investments are currently underway in key regions, including Pakistan, Argentina, and the Democratic Republic of Congo (DRC). This isn't just an environmental play; it's a move to secure more reliable, lower-cost power for long-life assets, reducing the volatility associated with fossil fuel prices. Plus, it aligns their operations with global sustainability demands, which is key for attracting institutional capital.
Barrick Gold Corporation (GOLD) - PESTLE Analysis: Legal factors
Compliance with the US Foreign Corrupt Practices Act (FCPA) and global anti-bribery laws is a constant, high-stakes focus.
Operating in high-risk jurisdictions means compliance with the US Foreign Corrupt Practices Act (FCPA) and other global anti-bribery laws is not just a policy, but a critical risk management function. The legal environment in countries where Barrick Gold has major assets, like the Democratic Republic of Congo (DRC) and Mali, increases the exposure to potential violations, even if unintentional. You have to be defintely vigilant when dealing with government officials and third-party agents in these regions.
A concrete example of this governance challenge is the ongoing scrutiny related to human rights impacts. The company is responding to recommendations from Canada's National Contact Point (NCP) for the OECD Guidelines concerning a 2021 government-led resettlement operation near the Kibali Gold Mines (45% owned by Barrick Gold) in the DRC. To address this, Barrick Gold planned an independent human rights assessment of the Kibali mine for 2025 to ensure full compliance with international standards, which is a necessary step to mitigate legal and reputational risk.
New or revised mining codes in countries like Mali and Zambia could impact royalty and tax rates unexpectedly.
The trend of resource nationalism-where host governments seek a greater share of mining profits-is a major legal risk that directly hits your bottom line. Mali's new 2023 mining code, for instance, has been a significant flashpoint. This code allows the Malian state to increase its ownership stake in mining projects from the previous 20% up to a maximum of 35%, plus it removes certain tax exemptions.
This new code fueled a major dispute over the Loulo-Gounkoto complex, which accounts for over 10% of Barrick Gold's total gold output. The Malian government claimed approximately $500 million in unpaid taxes and penalties. This is the kind of unexpected financial liability that can derail a fiscal year.
In Zambia, the regulatory environment for the Lumwana copper mine has also shifted, though in a more mixed way. The new Minerals Regulation Commission Act, 2024, centralizes oversight.
Here is a quick look at the recent tax and regulatory changes in key African jurisdictions:
| Country | Mine/Complex | Key 2025 Legal/Tax Change | Financial Impact/Data Point |
|---|---|---|---|
| Mali | Loulo-Gounkoto | New 2023 Mining Code increases state equity option up to 35%. | Dispute over approx. $500 million in tax claims; settled in Nov. 2025 for a reported $438 million payment. |
| Zambia | Lumwana Copper Mine | Minerals Regulation Commission Act, 2024, enacted. Corporate Income Tax (CIT) reduced to 30% (from 35%), and mineral royalties are now deductible. | Lumwana contributed $887 million to the Zambian economy in 2024. Property Transfer Tax on exploration licenses increased from 5% to 8%. |
Permitting for the Pueblo Viejo expansion is a complex, multi-year legal and regulatory hurdle to clear.
The Pueblo Viejo expansion in the Dominican Republic is a Tier One asset, but its life-of-mine extension is heavily dependent on clearing environmental and permitting hurdles for the new Naranjo tailings storage facility (TSF). This is a multi-year, multi-billion-dollar regulatory gauntlet. The total estimated capital cost for the plant expansion and mine life extension remains around $2.6 billion.
As of September 30, 2025, Barrick Gold had already spent $1.19 billion on the project (on a 100% basis). Despite this massive investment, the project faces legal headwinds:
- Two constitutional 'amparo' actions were filed in May 2025 by local groups in a Dominican administrative court.
- These actions sought to suspend construction of the Naranjo TSF and revoke its environmental license.
- One action was dismissed on procedural grounds in September 2025, but the plaintiffs immediately filed an appeal in October 2025.
The permitting process is never a straight line; it is a legal boxing match.
International arbitration remains a necessary tool for resolving large-scale disputes with host governments.
When negotiations fail in a politically volatile environment, international arbitration-specifically through bodies like the World Bank's International Centre for Settlement of Investment Disputes (ICSID)-becomes your ultimate legal defense. Barrick Gold initiated ICSID arbitration against Mali in December 2024.
The dispute escalated dramatically in 2025, with the Malian government taking aggressive, non-judicial actions, including seizing three metric tons of gold (valued at an estimated $245 million in June 2025) and placing the Loulo-Gounkoto complex under provisional state administration. This is why you need a binding international treaty.
The dispute was ultimately resolved in November 2025, with the settlement including Barrick Gold agreeing to drop the ongoing ICSID arbitration case. The use of arbitration provided the necessary leverage to force a resolution, but the cost of the dispute was significant, including a reported $438 million settlement payment to Mali.
Barrick Gold Corporation (GOLD) - PESTLE Analysis: Environmental factors
Water stewardship is a top priority, with a goal to reduce freshwater usage by 10% by 2030 across its portfolio.
Water management is a critical operational and social license risk for Barrick Gold Corporation, especially in water-scarce regions like Nevada and Saudi Arabia (Jabal Sayid). While the explicit 10% freshwater reduction target by 2030 is a long-term goal, the company's immediate focus is on maximizing water recycling and reuse to minimize withdrawal from local sources.
In 2023, Barrick achieved an 84% water reuse and recycle rate across its operations, significantly exceeding its internal target of 80%. This is a huge operational win, but you still have to manage the sheer volume of water at high-rainfall sites like Pueblo Viejo in the Dominican Republic and Kibali in the Democratic Republic of Congo (DRC), where the challenge shifts to clean water discharge and flood control. The core action here is optimizing closed-loop systems, which reduces the business's exposure to local water stress and community conflict.
Significant focus on climate change risk, including transitioning to renewable power sources for key mines.
The company has already met its near-term greenhouse gas (GHG) emissions target ahead of schedule, which is a key de-risking factor for investors. Barrick achieved a 16% reduction in Scope 1 and 2 GHG emissions in 2023 against its 2018 baseline of 7,541 kilotonnes of carbon dioxide equivalent (kt CO2e), surpassing its original 15% target for 2025. This achievement sets the stage for the next, more ambitious goal: a 30% reduction by 2030.
This transition is being driven by significant capital investment in renewable energy projects at key Tier One assets. That's a clear, actionable strategy. Here's a look at the renewable energy footprint as of 2025:
- Nevada Gold Mines (NGM): The 200-megawatt (MW) TS Solar Plant is in commercial production, and it is expected to meet 15% to 20% of NGM's annual power demand. This single project alone accounts for a 5% reduction in Barrick's overall GHG emissions against the 2018 baseline.
- Loulo-Gounkoto Complex (Mali): The site utilizes a 72-MW solar power facility paired with a 38-MW Battery Energy Storage System (BESS). In Q1 2024, solar power accounted for 28% of the total energy blend, leading to substantial energy cost savings compared to heavy fuel oil.
Tailings dam management and adherence to the Global Industry Standard on Tailings Management (GISTM) is mandatory.
The Global Industry Standard on Tailings Management (GISTM) is the new global baseline for operational risk, and Barrick has met the critical 2025 disclosure deadline. Full conformance is non-negotiable for maintaining a social license to operate and mitigating catastrophic failure risk.
The company has publicly disclosed information for all 65 Tailings Storage Facilities (TSFs) it owns, operates, or has in the design phase. Transparency here is defintely the new standard for the sector.
| TSF Risk Classification (GISTM) | Number of Facilities | 2025 Conformance Status | Implication |
|---|---|---|---|
| Extreme Consequence | 5 | Conforming to GISTM | Highest regulatory scrutiny and capital expenditure required. |
| Very High Consequence | 12 | Conforming to GISTM | Requires continuous independent review and robust emergency planning. |
| Facilities in Safe Closure | 13 | Not subject to GISTM disclosure | Represents a reduction in long-term environmental liability. |
| Total TSFs (Owned/Operated/Design) | 65 | Disclosure Fulfilled (Aug 2025) | Commitment to global best-practice transparency. |
Reclamation and closure costs are rising, requiring higher provisions on the 2025 balance sheet.
The increasing complexity of environmental regulations and higher discount rates drive up the estimated cost of future mine closure and reclamation. This mandatory cost, known as the Asset Retirement Obligation (ARO) or rehabilitation provision, is a non-current liability that grows annually through accretion and amortization, which is captured in the All-in Sustaining Costs (AISC).
The rising cost of capital and the need for more comprehensive closure plans-including biodiversity conservation and long-term water treatment-mean your financial provisions must be constantly reassessed. For 2025, Barrick's Gold AISC Guidance is in the range of $1,510-$1,610 per ounce. This figure explicitly includes the accretion of reclamation costs, clearly showing the environmental liability's direct impact on the cost of production. Furthermore, the company continues to move inactive sites into 'Safe Closure' status, with 13 facilities already achieving this designation, which is a practical way to reduce the overall long-term environmental liability exposure on the balance sheet.
Disclaimer
All information, articles, and product details provided on this website are for general informational and educational purposes only. We do not claim any ownership over, nor do we intend to infringe upon, any trademarks, copyrights, logos, brand names, or other intellectual property mentioned or depicted on this site. Such intellectual property remains the property of its respective owners, and any references here are made solely for identification or informational purposes, without implying any affiliation, endorsement, or partnership.
We make no representations or warranties, express or implied, regarding the accuracy, completeness, or suitability of any content or products presented. Nothing on this website should be construed as legal, tax, investment, financial, medical, or other professional advice. In addition, no part of this site—including articles or product references—constitutes a solicitation, recommendation, endorsement, advertisement, or offer to buy or sell any securities, franchises, or other financial instruments, particularly in jurisdictions where such activity would be unlawful.
All content is of a general nature and may not address the specific circumstances of any individual or entity. It is not a substitute for professional advice or services. Any actions you take based on the information provided here are strictly at your own risk. You accept full responsibility for any decisions or outcomes arising from your use of this website and agree to release us from any liability in connection with your use of, or reliance upon, the content or products found herein.